Council resumed Stage 1 work which was on hold due to the lack of funding and hard rock cutting for the trench. Additional $310,000 from the Developer Contributions was made available to complete Stage 1 works.
Installation of drainage pipes and pits, cutting table drain, adjustment to some driveways as required and rock excavation for the trench.